Project Description

KAE undertook all services design for the remedial works at this Stocklands Shopping centre.

The existing centre had over heating issues associated with large sky lights in the mall areas and food court area.

As part of KAE’s design, new air conditioning was installed together with modern controls to reduce energy consumption.

Energy Reduction measures included:

  • CO2 control of fresh Air
  • Relocation of control sensors
  • Controlled high level warm air relief

An important factor in the design was to minimise works within the centre i.e. not impact on trading.

Data Sheet