9. PROJECTS

MECHANICAL

Darling Park Tower [click for datasheet]
Darling Park Tower 1, located at 201 Sussex Street, Sydney comprises 51,000 sqm over 27 levels.

KAE, working for the co-owners of Darling Park Tower 1, GPT Wholesale Office Fund, Multiplex Capital and AMP Capital Investors has provided the technical expertise for this upgrade creating a state of the art CBD building.

The building is to be upgraded from its current 3.5 star ABGR to a minimum 4.0 star (with a target of 4.5 stars ABGR).

Services Undertaken
KAE has undertaken the base building design for this project including:

  • Replacement of 2 off standby generators
  • New power supplies to Data Centre floors
  • Up grade of VAV system on each floor
  • New Central plant chillers and cooling towers
  • All new lighting design
  • Security Up-grade
  • BMCS up grade
  • Provision of new risers throughout the building
  • Provision of supplementary outside air and cooling water systems

Wollongong Multi-Storey Office Development [click for datasheet]
KAE undertook the Mechanical, Electrical and Acoustic designs for this 7 storey office building in Wollongong. This project utilises KAE's energy expertise to achieve a 4.5 Star rated building.

Sussex Hay [click for data sheet]

Sussex Hay

This Sydney located project is based in the China town area. The building is > 25m tall and houses significant restaurants with office levels above.

Below ground areas include, 2 levels of car park, loading dock, grease arrestor rooms etc.

KAE undertook design for Mechanical and Electrical Services.

The building services are designed to achieve an ABGR 4.5 star rating.

Mechanical:

  • Zone Smoke Control Systems
  • BMCS
  • Stair Pressurisation
  • CBD basement sub station ventilation system
  • ABGR 4.5 star air conditioning design
  • Provision of new risers throughout the building
  • Independent restaurant air conditioning
  • Provision of supplementary outside air and cooling water systems
  • Kitchen and misc. ventilation systems

Electrical:

  • CBD basement substation chamber
  • Distribution boards configured for multiple tenancy metering within floor
  • Main switchboard configured for multiple floor tenancy metering
  • Energy efficient lighting design
  • Greenstar /ABGR Metering
  • Perimeter PE cell daylight harvesting lighting control
  • Surge protection
  • BMCS lighting control with local occupancy and time delay overrides
  • Power Factor Correction
  • Computer monitored Emergency & Exit lighting
  • Base building voice cabling to retail /restaurants/ office levels
  • Access control & Intruder detection system
  • Backbone MATV cabling provision to retail /restaurants/ office levels
  • Tenancy audio-visual intercom system
  • CCTV system
  • Smoke detection & EWIS system

Rocky Point Road [click for data sheet]

The project comprises a 4 storey office building with car park below and an extensive high bay warehouse attached to the office building.

KAE provided the following services:

Mechanical:

  • Air conditioning to office building and show room configured for multiple tenancy operation
  • BMCS control system
  • Ventilation (Kitchens, Toilets, Garbage rooms, Misc. areas)

Electrical:

  • Main switchboard configured for multiple floor tenancy metering
  • Base building voice cabling to office levels
  • Greenstar /ABGR Metering
  • Backbone MATV cabling provision to office levels
  • Surge protection
  • User friendly Access control & Intruder detection system time delay overrides
  • Power Factor Correction
  • Audio-visual intercom system
  • Distribution boards configured for multiple tenancy metering within floor
  • BMCS lighting control
  • Energy efficient warehouse/ office lighting design, including Internal PE cell daylight harvesting lighting control to warehouse and office lighting
  • CCTV system
  • Computer monitored Emergency & Exit lighting
  • Smoke detection & EWIS system

ESD:

KAE are undertaking ESD services for this project.

200 Crown Street, Darlinghurst (KAE)
KAE undertook the air conditioning design for this boutique 3 storey office building.

University Admissions Centre, Homebush (KAE)
KAE undertook the mechanical design for UAC’s tenancy fit out within a new office development at Homebush. The design included multiple meeting rooms with individual systems, computer room and general modifications required due to tenancy walls.

Mediterranean Shipping Company, Office Fit Out, King Street Wharf (KAE)
KAE undertook all services design (mechanical, electrical, fire, hydraulics and communications) for MSC’s tenancy fit out within a new office development as part of the King Street Wharf development, Darling Harbour. The design included multiple meeting rooms with individual systems, computer room and general modifications required due to tenancy walls.

Quad 11 – Office Quality Assurance Checks for Bovis Lend Lease (KAE)
KAE undertook the mechanical services quality checking role on behalf of BLL, for the D & C base building installation.

The installation generally comprised roof top air cooled chillers serving on floor air handling plant.

Quad 11 – Swift tenancy design for Bovis Lend Lease (KAE)
KAE undertook the mechanical design for Swift & Moore tenancy fit out within a new office development at Homebush. The design included multiple meeting rooms with individual systems, computer room and general modifications required due to tenancy walls.

363 George Street, Sydney

8-12 Bridge Street , Sydney

Binary Centre (KAE)
KAE undertook the Quality Assurance role for this project, on behalf of BLL, for mechanical services (KAE)

Fitness First, Castle Towers (KAE)

KAE undertook the Mechanical Services design for this project.


ELECTRICAL

Australian Health Management HQ [click for datasheet]
KAE undertook the electrical services design for this development.

The building comprises a commercial development of c. 7000 sq.m.

The building has been designed to achieve a Premium grade PCA 'A' grade building and ABGR 4.5 star rating.

Services include:

  • Power
  • Lighting
  • Security
  • Communications
  • Substation

KAE also undertook the integrated tenancy design for this project.

Mediterranean Shipping Company, Office Fit Out, King Street Wharf (KAE)
KAE undertook the electrical and communications design for MSC’s tenancy fit out within a new office development as part of the King Street Wharf development, Darling Harbour.

The design included multiple meeting rooms with individual systems, computer room and general modifications required due to tenancy walls.

Sussex Hay Centre
KAE undertook the electrical services design for this CBD mixed use development.

The building comprises 10 levels comprising retail, restaurants and offices.

The building has been designed to achieve a Premium grade PCA 'A' grade building and ABGR 4.5 star rating.

Services include:

  • Power
  • Lighting
  • Security
  • Communications
  • Substation

HYDRAULICS / FIRE

Mediterranean Shipping Company, Office Fit Out, King Street Wharf (KAE)
KAE undertook the hydraulic services design for MSC’s tenancy fit out within a new office development as part of the King Street Wharf development, Darling Harbour. The design included provision for toilets, condensate removal, hot and cold water supplies etc.


ACOUSTICS

Various commercial noise problem amelioration work.


FACILITIES MANAGEMENT

Coming soon...


STRUCTURAL

Warehouse and Office Buildings – Revesby, Frenchs Forest, Mascot, Huntingwood


BUILDING SURVEY REPORTS

Chatswood Water Board Building Shopping Centre

KAE undertook a pre purchase report for this shopping centre for the following services:

  • Mechanical
  • Electrical
  • Fire
  • BCA
  • Hydraulic

In addition KAE provided details on upgrade costs and spatial implications to convert this building into offices, restaurants and retail areas.